Stage 3 - User specification

Following a successful feasibility study at stage 2, we now move into a detailed User Specification. It contains two detailed planning documents plus a process flow diagram, a simple (14 steps) procedure, glossaries, etc. This document (the user specification) is the key project document that will detail all user requirements, both in operational and functional terms, action plans, timelines, budget for resources and set the standards for the rest of the project. Small projects with limited resources and fast-tracking projects (that is, those not required to perform a feasibility study) begin with this document. International IT planning document.

Document: 
F-1009UserSp_0.doc
Price: 
AUD $66.00
No. of pages: 
39

Following a successful feasibility study at stage 2, we now move into a detailed User Specification.

Pay-per-Download - Free to members
Reference: 
F-1009